digging-a-fallout-shelter-with-a-shop-vacuum-in-these-uncertain-tiimes

Digging a Fallout Shelter with a Shop Vacuum

Digging a Fallout Shelter with a Shop Vacuum: A Comprehensive Guide

digging-a-fallout-shelter-the-atomic-cloud-rising-over-nagasaki-japan
Credit: National Archives [Photograph: The atomic cloud rising over Nagasaki, Japan, August 9, 1945. National Archives Identifier 535795]

Introduction

Digging a fallout shelter with a shop vacuum is an innovative approach in today’s uncertain world where preparing for potential emergencies like nuclear fallout is more relevant than ever.  Whether you identify as a prepper, a DIY enthusiast, or someone interested in safeguarding against nuclear threats, digging a fallout shelter is a practical step. Interestingly, you can dig a fallout shelter efficiently using a shop vacuum. This blog will guide you through the steps and considerations of using a shop vacuum to excavate your fallout shelter.

Why Use a Shop Vacuum?

Digging a fallout shelter manually can be labor-intensive and time-consuming. The most challenging aspect is removing dirt from the hole. A high-performance shop vacuum, such as the Cat 6 Tools Hurricane Electric Drum Vacuum, can make this task significantly easier. Capable of removing sand, gravel, and dirt at a rate of up to 2 pounds per second, this innovative method allows you to dig faster and more efficiently.

cat-6-tools-hurricane-electric-drum-vacuum-for-digging-a-fallout-shelter

For example: Digging a 7ft x 5ft x 4ft hole produces about 19,600 pounds or soil. This is almost a 10 ton dump tuck load. Seems like a daunting task, right? We’ll using a vacuum can change all that. Consider that a shop vacuum removing dirt at the rate of 2 pounds a second, can removing 20,000 lbs in 10,000 seconds. This converts to 167 minutes or roughly 2.8 hours. This becomes a manageable task for one person using a variety of means to loosen the dirt for extraction.

Tools to Loosen Dirt for Vacuum Extraction

To maximize the efficiency of digging a fallout shelter with your shop vacuum, it is essential to employ a variety of tools to loosen the dirt for extraction. A sturdy shovel is indispensable for moving large quantities of soil and gravel, while a spade shovel excels at penetrating and turning over compacted earth. For tackling rocky or hard-packed soil, a digging bar proves to be an invaluable asset, breaking up stubborn materials with ease. Additionally, a small electric jackhammer can be employed for more intensive jobs, swiftly fracturing tougher substrates that manual tools cannot handle. Vacuum digging attachments also play a crucial role, connecting seamlessly with your shop vacuum to direct suction precisely where it’s needed, ensuring a thorough and efficient excavation process. By combining these tools, you can significantly expedite the digging process, making the task of building your fallout shelter far more manageable.

When Digging a Fallout Shelter, Dealing with Dust in the Hole

The shop vacuum plays a dual role in not just removing loose dirt but also extracting dusty air from the excavation site. When digging a fallout shelter this function is crucial for maintaining a clear and breathable working environment, especially in confined spaces where dust can quickly accumulate. As the vacuum eliminates the loose soil, it simultaneously draws in dust particles that would otherwise compromise the air quality. This effective removal of dust reduces the likelihood of overloading a face mask, ensuring that workers can breathe easier and focus on the task at hand. It’s advisable to use face masks with dust filters to provide an additional layer of protection; such masks are readily available at Harbor Freight. By integrating these measures, the shop vacuum not only streamlines the digging process but also safeguards the health and safety of those involved.

Innovative Method for Efficient Digging

Using a shop vacuum involves a two-person team—one person operates the vacuum at the top, while the other digs and uses the suction hose to remove debris from the hole. This division of labor not only speeds up the process but also minimizes physical strain.

Steps and Considerations for Digging a Fallout Shelter

1. Choose the Right Location

Selecting the optimal location for digging your fallout shelter is crucial. Ideally, it should be under a concrete foundation, which provides additional protection and structural integrity. Ensure the area is free from utility lines or other underground obstructions.

2. Determine the Size of the Shelter

A standard fallout shelter should measure approximately 7 feet by 5 feet by 4 feet deep. These dimensions provide ample space for basic necessities and offer effective protection from radiation.  When laying out the shelter, at least one (1) 90 degree bend should separate the outside and the living space.   Radiation does not go around bends so maks a turn into the living space to protect the occupants when digging a fallout shelter.

3. Calculate the Volume of Dirt

Before you start digging a fallout shelter, use the Cat 6 Tools Soil Volume and Weight Calculator to determine the volume of dirt you need to remove from your excavation. When digging a fallout shelter, this informatiion will help you plan the excavation process more effectively. A cavity measuring 7ft (84″) x 5ft (60″) x 4ft (48″) results in a volume of 140 cubic feet and produces 14,000 pounds of dirt. Due to the swell factor, the actual volume of loose dirt to manage is 182 cubic feet, equivalent to 1,361 gallons. This translates to 85 full loads in a 16-gallon drum or just over 45 full loads in a 30-gallon drum, such as the Cat 6 Tools Tilt Drum. This drum can easily hold 400 lbs of dirt and is simple to empty. For more details, visit: https://cat6tools.com/product/hurricane-tilt-drum-vacuum/.

4. Assess Vacuum Capacity

Next, use the Time to Fill Calculator to estimate how quickly your vacuum container will fill up. This information will help you understand the capability of your shop vacuum and plan for efficient dirt removal.  As you will see, the vacuum container will fill rapidly, so making arrangements for dumping it often should be considered.

5. Selecting the Right Vacuum for digging a fallout shelter

Choosing the appropriate vacuum is essential for efficient dirt removal and overall workflow effectiveness. One highly recommended option is the Cat 6 Tools Hurricane Drum Vacuum, which comes in various capacities such as 10-gallon, 16-gallon, and the 30-gallon easy to dump Tilt Drum. The tilt drum feature of the 30-gallon model, available from Cat 6 Tools, ensures effortless emptying, thereby enhancing productivity and reducing downtime.

cat-6-tools-3-wheel-tilt-drum-for-digging-a-fallout-shelter

The different sizes allow you to choose a vacuum that fits your specific project needs, ensuring that you can maintain the pace of dirt removal without frequent interruptions. Consider factors such as the volume of dirt to be removed and the duration of the project when making your selection, ensuring you have a vacuum that meets both capacity and efficiency requirements.

5. Start Digging

Begin the excavation by marking the dimensions of your shelter on the ground. Dig down to the desired depth, using the shop vacuum to remove dirt as you go. The person below should focus on loosening the soil, while the person above ensures continuous suction to clear out the debris.

6. Monitor Progress and Safety

Regularly check the progress of your digging and ensure that the vacuum is functioning correctly. Safety is paramount, so make sure to follow all safety guidelines, including wearing protective gear and ensuring proper ventilation in the digging area.

7. Utilize an Efficient Vacuum System

A good 16-gallon drum vacuum, like the Cat 6 Hurricane Electric Drum Vacuum, is specifically designed for digging and can fill with dirt in as short a time as 83 seconds. Having a designated person to frequently dump the vacuum is crucial to keep up with the volume of dirt produced by the digger. The advantage of using a vacuum system is that it efficiently removes the dirt from the hole to a convenient location for dumping.

8. Enhance Radiation Shielding

Don’t forget that the removed dirt can be placed on top of the concrete foundation of your shelter to enhance radiation shielding. A minimum of 3 feet of earth, concrete, or other suitable materials will provide adequate protection from radiation, ensuring the safety and effectiveness of your fallout shelter.

9. Shore Up the Sides for Protection

To ensure the structural integrity of your fallout shelter, it is essential to shore up the sides of the hole. This can be accomplished using readily available materials such as boards from shelving, table tops, or bricks from patios. Carefully position these materials against the walls of your excavation to prevent collapses and to provide additional stability. Be methodical in reinforcing all sides to create a safe and reliable environment within the shelter. Remember, this fallout shelter only needs to remain viable for approximately 72 hours after fallout begins, so focus on practical and secure support solutions that can be implemented swiftly and effectively. This is a short term shelter.

10. Stock Your Shelter with Essentials

To ensure your stay in the fallout shelter is as manageable as possible, it’s crucial to stock it with necessary supplies. At a minimum, you should have enough bottled water to last for 3 days (72 hours), non-perishable food items such as food bars, and buckets with lids to handle sewage. Flashlights and potassium iodine tablets are essential for light and radiation protection, respectively. Additionally, consider bringing items for comfort, such as a cot for sleeping, blankets, and perhaps a portable radio for updates. Packing these items into a grab-and-go kit will ensure you can quickly and efficiently make your way to the shelter with everything you need to sustain yourself for a few days.

Civil Defense Example of Temporary Fallout Shelter

Here is a depiction of a recommended fallout shelter for Americans from the Civil Defense Agency in the 1950’s.    Most Americans don’t have basements, sandbags, sand for sandbags, and even enough food for a week.   However, a pretty little sketch at least makes one feel better knowing that with a little effort surviving a nuclear war is easy.

temporary-basement-fallout-shelter-concept
Credit: National Archives https://catalog.archives.gov/id/542104

 

Below is a copy of the front page of a Civil Defense Manual for Nuclear Fallout.

Conclusion

In summary, constructing a fallout shelter using a shop vacuum is a time-saving and efficient approach. By adhering to the detailed steps, you can create a secure and functional refuge for nuclear fallout protection. For personalized advice and expert support, consult Cat 6 Tools, whose advanced equipment and experienced team can help you select the right vacuum equipment.

Ready to get started? Contact Cat 6 Tools for help on selecting the right vacuum for your needs today and take the first step towards enhanced preparedness.

To access some of the photos here is the link to the National Archives.